Maintenance records, return to service and FAA Form 337
The General tests the exact contents of a maintenance entry, the difference between a 43.9 work entry and a 43.11 inspection entry, where Form 337 goes, and which records stay with the aircraft when it is sold.
| 43.9 work entry | Description or reference to acceptable data, completion date, name of the worker, and the approver's signature, certificate number and kind of certificate |
| What a 43.9 signature approves | Only the work performed |
| 43.11 inspection entry | Type and extent, date and total time in service, signature and certificate data, plus the airworthiness statement |
| Aircraft not approved | Owner gets a signed, dated list of discrepancies and unairworthy items |
| Form 337 | At least in duplicate: signed copy to the owner, copy to the FAA Aircraft Registration Branch in Oklahoma City within 48 hours |
| Records kept until superseded or 1 year | Routine maintenance and inspection entries (91.417) |
| Records transferred on sale | Total time, life-limited parts, time since overhaul, inspection status, AD status, Form 337s (91.417) |
| Flight check after alteration | Private pilot or higher flies it and logs it before passengers, unless ground tests prove no change (91.407) |
Where the point is lost: Watch the owner's role: the owner does not sign the maintenance entry, but the owner is who receives the Form 337 copy and the discrepancy list, and who must keep the records.
Maintenance records, return to service and FAA Form 337
8 questions on A&P maintenance record entries, each with an explanation and statute citation.
8 questions
Pass line: 70%, same as the real exam
Questions and answers, explained
All 8 questions above, with the correct answer and why it is correct. Everything here is on maintenance records, return to service and faa form 337.
Which item is NOT required in a maintenance record entry under 14 CFR 43.9 for work performed?
Why: 43.9(a) requires a description (or reference to acceptable data), the completion date, the name of the person who did the work if different from the approver, and the approver's signature, certificate number and kind of certificate. The owner does not sign the maintenance entry.
Reference AM.I.I.K3 · 14 CFR 43.9(a)
When a mechanic signs a maintenance record entry under 14 CFR 43.9, that signature approves for return to service
Why: 43.9(a)(4) states it plainly: the signature constitutes the approval for return to service only for the work performed. Declaring the whole aircraft airworthy is what an inspection entry under 43.11 does.
Reference AM.I.I.K3 · 14 CFR 43.9(a)(4)
An annual inspection finds unairworthy items and the aircraft is not approved for return to service. What must the person doing the inspection give the owner?
Why: 43.11(a)(5) and (b): when an aircraft is not approved for return to service, the entry states that a list of discrepancies and unairworthy items dated (date) has been provided to the owner or operator, and that list must be signed and given to them.
Reference AM.I.I.K4 · 14 CFR 43.11(a)(5), (b)
Which of the following must appear in the record entry for a 100-hour inspection?
Why: 43.11(a)(1)-(3): the type and extent of the inspection, the date and the aircraft total time in service, and the signature, certificate number and kind of certificate of the person approving or disapproving it, plus the airworthiness statement.
Reference AM.I.I.K4 · 14 CFR 43.11(a)(2)
An airplane used for hire is due its 100-hour inspection and is flown 6 hours past that limit to reach the shop. When is the next 100-hour inspection due?
Why: 14 CFR 91.409(b) allows up to 10 hours over the limit en route to a place where the inspection can be done, but the excess time must be counted in computing the next 100 hours. 100 − 6 = 94 hours.
Reference AM.I.K.K4 · 14 CFR 91.409(b)
Under 14 CFR 91.417, which record must be retained and transferred with the aircraft when it is sold?
Why: 91.417(a)(2) records, including total time in service, life-limited part status, time since overhaul, current inspection status, current AD status and Form 337s for major alterations, are transferred with the aircraft. Routine maintenance entries are kept until the work is repeated or superseded, or 1 year.
Reference AM.I.I.K3 · 14 CFR 91.417(a)(2), (b)
After a mechanic completes a major repair and it is approved for return to service, a copy of FAA Form 337 must be sent within 48 hours to
Why: Appendix B to Part 43: execute Form 337 at least in duplicate, give a signed copy to the owner, and forward a copy to the FAA Aircraft Registration Branch in Oklahoma City within 48 hours after approval for return to service.
Reference AM.I.I.K5 · 14 CFR Part 43, Appendix B(a)
After an alteration that may have appreciably changed an aircraft's flight characteristics, who must fly it and log an operational check before passengers are carried?
Why: 14 CFR 91.407(b): no one other than crewmembers may be carried until an appropriately rated pilot with at least a private pilot certificate flies the aircraft, makes an operational check of the work, and logs the flight in the aircraft records. Ground tests may replace the flight if they show conclusively that flight characteristics were not affected (91.407(c)).
Reference AM.I.I.K3 · 14 CFR 91.407(b), (c)
Drill the whole domain
Other topics
- A&P General: Ohm's law, power and series-parallel circuits
- A&P weight and balance: moments, CG and adverse loading
- Aircraft corrosion types for the A&P General: how to tell them apart
- A&P mechanic privileges and limitations (14 CFR part 65)
- Aircraft bolts, nuts, rivets and safety wire for the A&P General
- Aviation fuel identification, fueling safety and fire classes
- The Dirty Dozen and maintenance human factors (A&P General)